Additional Information
In 1946, the subdivision "200 HTSM" resumed its work on the development of heavy hammer on the basis of tanks T-54 in accordance with the government's postwar program for the production of artillery weapons. Presented engineering requirements for the engine were as follows: 25-ton artillery towing system with a speed of 35 km / h in any conditions, carrying capacity of 5 tons, carrying capacity of 25 tons of traction. The Mover chassis must be equipped with grounding and special tools and drive mechanisms to control these tools. At-T VEHICLES include: BAT-M, BTM-3, MDK-2M
model Length: 213 mm
model Width: 91 mm
Number of parts 770+
Внимание! Клей и краски в набор модели не входит.
Additionally, we recommend also purchasing
Related Products